BEFORE | AFTER

CASE STUDY

HOVE | EAST SUSSEX

  • Repointing of the chimney stack and parts of the elevations
  • Recovering of the mineral felt to the main and secondary roofs
  • An overhaul of the slate clad pitched roof slopes
  • Render repairs to the elevations
  • Preparation Decoration & decoration of the rendered masonry
  • Preparation & decoration of the joinery
  • Preparation & decoration of the metalwork
  • An overhaul of the rainwater goods (roof gutters and downpipes etc)
  • Removal of the redundant water storage tank to the front tower

CLIENT:

RESIDENTS  MANAGEMENT COMPANY

ADDRESS:

THE DRIVE, HOVE, EAST SUSSEX BN3 3PE

DATE: 2017

CONTRACTOR:

WOODLAND CONSTRUCTION LTD

CONTRACT LENGTH:

21 WEEKS

External Repair and Redecoration